Rubber Lining Repair & Relining Service

Rubber Lining Repair & Relining Service

Relining service for worn or damaged rubber lined pipes, fittings and tanks. Old lining is stripped, the steel surface is re-blasted and inspected, new lining is applied and vulcanized, and the item i…

Price
FOB China port, negotiable
MOQ
1 spool / trial order welcome
  • Lead Time: 20–35 days after deposit
  • Supply Ability: 3,000 tons / month
  • Port: Tianjin / Qingdao, China
  • Payment: T/T, L/C at sight
  • WA
    Wang Hao · Sales Manager Replies within 24 hours · 18000672008@163.com

    Product Description

    Relining service for worn or damaged rubber lined pipes, fittings and tanks. Old lining is stripped, the steel surface is re-blasted and inspected, new lining is applied and vulcanized, and the item is spark-tested before return to service. Relining costs a fraction of replacement and is often scheduled together with plant maintenance windows.

    Natural Rubber (NR) Butyl (IIR) EPDM Neoprene (CR) Spark Tested

    Specifications

    Scope pipe, fittings, tanks, chutes
    Process strip – sandblast – inspect – line – vulcanize – spark test
    Turnaround per item size and lining area
    Suitable For wear-damaged lining, pinhole leaks, planned maintenance
    Support on-site relining available for large items

    Applications

    Worn or damaged lined piping, tanks and chutes restored to service through our relining workshop process.

    Packing & Delivery

    Lined spools and fittings are protected with end caps and rubber guards on flange faces, bundled or crated for container loading. Shipping from Tianjin Port, with complete export documentation (invoice, packing list, B/L, lining test records).

    Frequently Asked Questions

    Which rubber should I choose for slurry service?
    For abrasive slurry such as mine tailings or dredging sand, soft natural rubber is usually the starting point — its resilience absorbs particle impact. For hotter media above about 80 °C, butyl or EPDM grades are recommended. Send us your medium data for a specific suggestion.
    What is your minimum order quantity?
    One spool is enough to start, and trial orders are welcome. For special fittings or relining service, MOQ may vary by item — send us your requirement for confirmation.
    How long is the delivery time?
    Normally 20–35 days after receiving the deposit, depending on lining area and specification. Production schedule can be confirmed before order placement.
    How do you control the lining quality?
    Every lined spool is 100% spark-tested (pinhole detection), with lining thickness and hardness measured and adhesion checked. Test records are available to customers.
    Which ports do you ship from?
    Tianjin Port is the nearest port. Qingdao and Shanghai are also available. We handle export documentation and can quote FOB, CFR or CIF terms.

    Send an Inquiry for this Product

    Rubber Lining Repair & Relining Service

    Tell us the medium, temperature, pipe size and quantity you need — our sales engineer will recommend the lining compound and reply within 24 hours.

    Call Now WhatsApp Email