Rubber Lined Reducer

Rubber Lined Reducer

Concentric and eccentric reducers with rubber lining for diameter transitions in lined piping. The lining follows the taper without steps or gaps, keeping slurry flow smooth and avoiding local turbule…

Price
FOB China port, negotiable
MOQ
1 spool / trial order welcome
  • Lead Time: 20–35 days after deposit
  • Supply Ability: 3,000 tons / month
  • Port: Tianjin / Qingdao, China
  • Payment: T/T, L/C at sight
  • WA
    Wang Hao · Sales Manager Replies within 24 hours · 18000672008@163.com

    Deskripsi Produk

    Concentric and eccentric reducers with rubber lining for diameter transitions in lined piping. The lining follows the taper without steps or gaps, keeping slurry flow smooth and avoiding local turbulence wear at the size change. Supplied in matched compound, flanged or beveled, spark-tested.

    Natural Rubber (NR) Butyl (IIR) EPDM Neoprene (CR) Spark Tested

    Spesifikasi

    Type concentric / eccentric
    Size Range DN25×20 – DN1200×1000
    End flanged / beveled
    Lining taper-formed, no step
    Test spark test

    Applications

    Slurry and chemical pipeline systems needing lined bends, branches and size transitions with the same protection as the main line.

    Packing & Delivery

    Lined spools and fittings are protected with end caps and rubber guards on flange faces, bundled or crated for container loading. Shipping from Tianjin Port, with complete export documentation (invoice, packing list, B/L, lining test records).

    Frequently Asked Questions

    Which rubber should I choose for slurry service?
    For abrasive slurry such as mine tailings or dredging sand, soft natural rubber is usually the starting point — its resilience absorbs particle impact. For hotter media above about 80 °C, butyl or EPDM grades are recommended. Send us your medium data for a specific suggestion.
    What is your minimum order quantity?
    One spool is enough to start, and trial orders are welcome. For special fittings or relining service, MOQ may vary by item — send us your requirement for confirmation.
    How long is the delivery time?
    Normally 20–35 days after receiving the deposit, depending on lining area and specification. Production schedule can be confirmed before order placement.
    How do you control the lining quality?
    Every lined spool is 100% spark-tested (pinhole detection), with lining thickness and hardness measured and adhesion checked. Test records are available to customers.
    Which ports do you ship from?
    Tianjin Port is the nearest port. Qingdao and Shanghai are also available. We handle export documentation and can quote FOB, CFR or CIF terms.

    Send an Inquiry for this Product

    Rubber Lined Reducer

    Tell us the medium, temperature, pipe size and quantity you need — our sales engineer will recommend the lining compound and reply within 24 hours.

    Produk Terkait

    Call Now WhatsApp Email