Rubber Lined Tee

Rubber Lined Tee

Equal and reducing tees with rubber lining for branch connections in lined pipeline systems. The lining is formed continuously through the branch, protecting the joint area where turbulence accelerate…

Price
FOB China port, negotiable
MOQ
1 spool / trial order welcome
  • Lead Time: 20–35 days after deposit
  • Supply Ability: 3,000 tons / month
  • Port: Tianjin / Qingdao, China
  • Payment: T/T, L/C at sight
  • WA
    Wang Hao · Sales Manager Replies within 24 hours · 18000672008@163.com

    Product Description

    Equal and reducing tees with rubber lining for branch connections in lined pipeline systems. The lining is formed continuously through the branch, protecting the joint area where turbulence accelerates wear. Flanged or butt-weld ends, in the same compound family as the main line. Reducing tees allow size transitions without adding extra fittings.

    Natural Rubber (NR) Butyl (IIR) EPDM Neoprene (CR) Spark Tested

    Specifications

    Type equal tee / reducing tee
    Size DN25–DN1200
    End butt-weld / flanged
    Lining continuous through branch
    Test spark test

    Applications

    Slurry and chemical pipeline systems needing lined bends, branches and size transitions with the same protection as the main line.

    Packing & Delivery

    Lined spools and fittings are protected with end caps and rubber guards on flange faces, bundled or crated for container loading. Shipping from Tianjin Port, with complete export documentation (invoice, packing list, B/L, lining test records).

    Frequently Asked Questions

    Which rubber should I choose for slurry service?
    For abrasive slurry such as mine tailings or dredging sand, soft natural rubber is usually the starting point — its resilience absorbs particle impact. For hotter media above about 80 °C, butyl or EPDM grades are recommended. Send us your medium data for a specific suggestion.
    What is your minimum order quantity?
    One spool is enough to start, and trial orders are welcome. For special fittings or relining service, MOQ may vary by item — send us your requirement for confirmation.
    How long is the delivery time?
    Normally 20–35 days after receiving the deposit, depending on lining area and specification. Production schedule can be confirmed before order placement.
    How do you control the lining quality?
    Every lined spool is 100% spark-tested (pinhole detection), with lining thickness and hardness measured and adhesion checked. Test records are available to customers.
    Which ports do you ship from?
    Tianjin Port is the nearest port. Qingdao and Shanghai are also available. We handle export documentation and can quote FOB, CFR or CIF terms.

    Send an Inquiry for this Product

    Rubber Lined Tee

    Tell us the medium, temperature, pipe size and quantity you need — our sales engineer will recommend the lining compound and reply within 24 hours.

    Related Products

    Call Now WhatsApp Email